Cracking on with the roof… This week, the rear elevation of the roof has had its last membrane layer added on top of the plywood sheets. We also have all 5 Velux windows now fully installed and ready for the final roofing material to be added. At the front, the first membrane and batons have been added, and the full length of the front edge of the porch roof has been defined in timber.
Lots of discussions are ongoing at the moment around the underfloor heating and the sprung floor of the main hall. It’s been quite a challenge to work out the final tweaks to the heating design to get the most efficient final system possible. More updates to come on that in the near future…